Warmth, in this incredibly Warm Winter

full

So after the large winter storm passed by here, it got warm.

Like really warm. There were some people wearing shorts. Winter, even around here, should not be that warm.

So its a fitting time to be knitting with wool, right?

In reality, both of these projects were conceived earlier in the month/last year.

Knowing that its supposed to be winter, I had decided that I needed a warm hat. I’m not a hat person, really, but I walked home (about 2 miles) one night when it was near freezing, and I only had a thin scarf and my “fall” coat (because its lighter than my winter coat, but still normally warm enough), and I’m pretty sure that I nearly died. It took me about 45 minutes to warm up enough to function like a human being, and then another hour past that to eat and drink enough hot stuff to warm up enough to fall asleep.

side

The next day I started this hat. I had this orphan skein that I got on sale when I was looking for sock yarn. I couldn’t find any on-sale sock yarn, but even with my full-price sock yarn, this still fit into my hobby budget. It may have been 4 dollars, and I’ve got a couple of yards left.

So the pattern is Helios, free on Ravelry. It’s a pretty good pattern, though I stuck with the size 7 needles throughout, since I don’t have a slightly bigger needle. It makes it more of a globbular slouchy hat, instead of a beret/tam kind of slouchy hat. The one thing I’m afraid of is blocking it, since it’s a tad big, and I don’t want to stretch it out any. My other green knit hat was too small, so I gave it away to my cousin, so I guess I overcompensated with this one, and made it too big.

top

Oops! Its still wearable, which is perfect. Because I was not going to admit defeat and try again.

And the second knit project is this pair of socks! This project can be described in three words:

Second Sock Syndrome.

full

Yes, this time I fell prey to SSS hard. Really hard. There was a thought in the back of my head that I should somehow work both socks together, and my circular needle collection does not include a skinny enough needle with a long enough connection. So I planned it that once I got to the ankle of the first sock, I’d put it on stitch holders, and start the second. Which worked perfectly.

Yarn-wise this is an alpaca merino blend that I intended to use for socks for my dad… last year. Meaning 2014. Sorry dad. It’s also not machine washable, so perhaps its best that I made them for me, since I’ll be more likely to remember that…

The pattern is ish-designed by me. Meaning, I used this book I got, Socks a La Carte 2 Toes Up to plan it out, with a rotating rib leg, technically a double picot cuff that I’m too lazy to fold over and seam. But once I made the toes of the first sock, I realized that I would get super bored doing a simple stockinette for the foot, so I found this.

lace-diamond-knitting-motif-chartTo be honest, I’m not sure where I found it, but I think it was on a Russian stitch pattern website, and since this was before I started the sock, so I never anticipated needing to cite the source. If you know who’s this is, please let me know! Because its a beautiful lace pattern, and I’d definitely suggest it!

So after finishing both feet of the socks, I started in on the rotating rib of one of the socks, and I got a long way through when I realized that I should weigh out the yarn so I could maximize the height of the sock. Once I double checked that, I ribbed until I got to the cuff, made the double picot cuff, bound off, and then the socks sat there. For months. And months.

What I haven’t  told you yet, is that these socks were started over the summer. July or August.

Oh yes.

These took me about 6 months.

leg

When I went home for the holidays I brought these with me, and didn’t even make it a row. So once I got back I vowed that I would finish before the semester started. Which also didn’t happen. I made progress, but didn’t finish it.

It was during the first week of the semester, and I told myself that I couldn’t start any new projects until I finished these. Trust me. These got finished really quick after that. I even took them with me to the movie theater when I saw Star Wars the second time. I had the whole row to myself, so I didn’t even feel (too) self conscious about KIPing. There are some advantages to itsy bitsy theaters.

And then I started on the hat! So a happy ending finally. Plus, the hat got done in less than a week. All that pent up knitting energy I guess!

Got any SSS, or longtime knitting projects?

Care to share?